Timber frame
The term 'timber frame' typically describes a system of panelised structural walls and floors constructed from small section timber studs, clad with board products, in which the timber frame transmits vertical and horizontal loads to the foundations. It is generally not used to refer to timber post and beam structures or to timber engineered structural frames.
Timber frames can be the most suitable choice if the structural shell is required quickly, if the ground conditions are particularly poor, or if the design does not include very large structural spans. For more information, see Advantages and disadvantages of timber frame buildings
There are a number of ways developing timber frame structures:
- A commonly-used method for constructing timber frames is the platform frame, in which each storey is formed by floor-to-ceiling timber panels and a floor deck which then becomes the platform for constructing the next storey.
- The engineered stud method with the installation of insulation between the load-bearing timber studs.
- The twin stud method involves two timber frame stud walls, positioned parallel to one another, (sometimes with only one carrying the vertical load), with an insulated cavity separating them.
- Structural insulated panels (SIPs) take the form of an insulating core sandwiched between two structural facings. In the UK, the mainstream suppliers typically use the same structural facing – oriented strand board (OSB). For more information see Structural insulated panels.
- Cross-laminated timber (CLT) building systems. See Cross-laminated timber for more information.
Fire resistance can be enhanced by internal linings, such as plasterboard, and cavity barriers which prevent fire from entering the cavity. For more information, see Timber framed buildings and fire.
Timber elements can also be oversized to aid fire resistance. For more information, see Sacrificial timber.
NB The role of Standards in offsite construction, A review of existing practice and future need, published by BSi in 2019, states: ‘Timber frame building can consist of wall panels, alongside floor and roof panels – often referred to as cassettes. These can also be open panel or closed panel. Open panels are timber frame wall panels, comprising studs, rails and sheathing on one face and a breather membrane. Closed panels also include linings on the faces of the panel, a vapour barrier and breather membrane. Closed panels may also include fitted windows, openings for doors and service routes. Manufactured in factory conditions, these cassettes and panels are brought to site and fixed together to form a rigid load-bearing superstructure. These consist of timber studs and beams, stiffened on one side with oriented strand board (OSB) and plasterboard.’
Fire safety in construction, written by HSE and Published by TSO (The Stationery Office), Third Edition, 2022, suggests that timber frame is: ‘A build method that relies on a timber frame for structural support. The construction method uses wall panels and floor decks, often factory-manufactured. The main systems used are classified as either open-panel, insulated or closed-panel. These panels can include the wall insulation pre-fitted and sometimes include the pre-fitting of doors, windows and service zones for on-site installation of mechanical and electrical works.’
[edit] Related articles on Designing Buildings
- Advantages and disadvantages of timber frame buildings.
- Aurora Log Homes.
- Balloon framing.
- Concrete frame.
- Cruck.
- Delivering sustainable low energy housing with softwood timber frame.
- Open panel timber frame.
- Padstone.
- Post.
- Sacrificial timber.
- Skeleton frame.
- Steel frame.
- Stud.
- Testing timber.
- Timber.
- Timber engineered structural frames.
- Timber roof.
- Timber framed buildings and fire.
- Timber post and beam construction.
- Timber preservation.
- Types of frame.
- Types of timber.
- Village homes in Western Uganda.
- Wood and climate change in 2021.
Featured articles and news
Future Homes Standard Essentials launched
Future Homes Hub launches new campaign to help the homebuilding sector prepare for the implementation of new building standards.
Building Safety recap February, 2026
Our regular run-down of key building safety related events of the month.
Planning reform: draft NPPF and industry responses.
Last chance to comment on proposed changes to the NPPF.
A Regency palace of colour and sensation. Book review.
Delayed, derailed and devalued
How the UK’s planning crisis is undermining British manufacturing.
How much does it cost to build a house?
A brief run down of key considerations from a London based practice.
The need for a National construction careers campaign
Highlighted by CIOB to cut unemployment, reduce skills gap and deliver on housing and infrastructure ambitions.
AI-Driven automation; reducing time, enhancing compliance
Sustainability; not just compliance but rethinking design, material selection, and the supply chains to support them.
Climate Resilience and Adaptation In the Built Environment
New CIOB Technical Information Sheet by Colin Booth, Professor of Smart and Sustainable Infrastructure.
Turning Enquiries into Profitable Construction Projects
Founder of Develop Coaching and author of Building Your Future; Greg Wilkes shares his insights.
IHBC Signpost: Poetry from concrete
Scotland’s fascinating historic concrete and brutalist architecture with the Engine Shed.
Demonstrating that apprenticeships work for business, people and Scotland’s economy.
Scottish parents prioritise construction and apprenticeships
CIOB data released for Scottish Apprenticeship Week shows construction as top potential career path.
From a Green to a White Paper and the proposal of a General Safety Requirement for construction products.
Creativity, conservation and craft at Barley Studio. Book review.
The challenge as PFI agreements come to an end
How construction deals with inherited assets built under long-term contracts.
Skills plan for engineering and building services
Comprehensive industry report highlights persistent skills challenges across the sector.
Choosing the right design team for a D&B Contract
An architect explains the nature and needs of working within this common procurement route.
Statement from the Interim Chief Construction Advisor
Thouria Istephan; Architect and inquiry panel member outlines ongoing work, priorities and next steps.